Industrial electrical engineering & supply • Cairo, Egyptinfo@alfreeg.com•+20 2 25905001
Power continuity

UPS systems & power continuity in Egypt

Scope the UPS around the real load, required runtime and operating environment — then confirm the exact model and commercial availability by quotation.

Home•Products•UPS & power continuity
Selection first

A UPS is a power-continuity system, not just a kVA number.

The same nominal UPS rating can produce very different results depending on power factor, battery runtime, phase configuration, load type, redundancy and generator interaction.

Online / double conversion

For applications where continuity and conditioned power are important.

Line-interactive

For lighter duty applications where the requirement and load profile fit.

Three-phase UPS

For larger commercial, technical and industrial power-continuity requirements.

Battery & runtime

Autonomy sized against the actual load and required operating time.

Maintenance bypass

Plan a service path so critical loads can remain manageable during maintenance.

Generator / ATS coordination

Review source transfer, generator behaviour and UPS input characteristics together.

What to send for selection

Connected load in kW or kVAInput/output voltage and phaseRequired runtime in minutesLoad type: IT, motors, control, medical, etc.Quantity and project cityAmbient/site conditionsGenerator / ATS details if presentSLD, BOQ or equipment list if available

Typical applications

IT & networking

Servers, network equipment, storage and critical communications.

Industrial control

PLC, instrumentation, control and process continuity loads.

Facilities

Selected building systems, security, access and technical equipment.

UPS FAQ

Questions that affect the specification.

What UPS size do I need?

The right starting point is the actual connected load in kW or kVA, the type of load, growth margin and required battery runtime.

What is an online double-conversion UPS?

An online UPS continuously conditions the power path through its conversion stages, which is commonly used where power quality and continuity are important.

Can a UPS be coordinated with a generator and ATS?

Yes, but generator sizing, UPS input behaviour, transfer timing, bypass arrangement and protection coordination should be reviewed together.

How do I request a UPS quotation?

Send load kW/kVA, input and output phase/voltage, required runtime, quantity, project city, environment and any available SLD or BOQ.