Industrial electrical engineering & supply • Cairo, Egyptinfo@alfreeg.com•+20 2 25905001
Panel engineering

Low-voltage panels built around the operating requirement.

From source arrangement and operating sequence to protection, control and handover — the scope starts with how the system needs to work.

Home•Panels
Panel scope

Panel solutions built around the operating requirement.

Architecture and component selection are driven by load, power sources, operating sequence, site conditions and continuity requirements.

ATS

Automatic Transfer Panels

Controlled changeover between power sources around the required operating logic and continuity target.

SYNC

Synchronising Panels

Source or generator coordination for applications that require synchronising and controlled operating sequences.

LV

Low-Voltage Distribution

Distribution and protection of feeders and loads around the actual electrical system.

PFC

Power-Factor Correction

Reactive-power compensation based on load information and network requirements.

CTRL

Control Panels

Operating, protection, indication and control circuits assembled around the application.

BYP

Bypass Panels

Alternative operating paths for maintenance or continuity where the system design calls for them.

Before quotation

Better input means a cleaner technical selection.

You do not need a perfect tender package. Send what is available and we can start from there.

Single-line diagram or available drawingVoltage, current or major loadsPower sources: utility / generator / multiple sourcesRequired operating sequenceInstallation environment and panel locationQuantity and preferred components, if any
From requirement to handover

A defined engineering path, not a box of assembled components.

AL-FREEG’s panel scope covers design, assembly, final inspection, delivery and technical coordination for low-voltage applications.

01

Review

Understand load, sources, operating sequence and environment.

02

Architecture

Define panel function, protection and control points.

03

Selection

Match components and ratings to the application.

04

Build & inspect

Assemble the defined scope and review it before delivery.

05

Handover & support

Clear delivery with technical and operating coordination.

Common questions

Before you start.

Quick answers to the information that helps start a clean technical review.

What should I send for a panel quotation?

Send any available single-line diagram, load or current data, power-source arrangement, operating sequence, quantity and installation conditions. A complete tender package is useful but not required to start the review.

Can I send a BOQ or single-line diagram?

Yes. A BOQ, single-line diagram, panel schedule or written operating description can all be used as the starting point for technical review.

Can AL-FREEG support component supply as well as complete panels?

Yes. AL-FREEG supports industrial electrical product supply alongside low-voltage panel engineering and assembly. The final scope is defined around the project requirement.

How are model availability and lead time handled?

Exact model availability and lead time are checked for each quotation so the commercial offer reflects the current supply position.

Have a panel requirement?

Send the drawing, load schedule or even the operating description.

Panel typePower sourcesLoads / ratingsDrawing or notes